“Assembly required” is always a nerve wracking statement when we are making a purchase. Exactly how much assembly are we talking about here? It is hard to tell whether there are two pieces or 200 pieces to assemble, until the package is home and fully unwrapped. Even in circumstances in which an item comes fully intact, it is rare when anything is fully functional straight out of the box. As much as we would like to believe that commodity items should simply work, they don’t. It is a difference in expectations, which can be frustrating to say the least. When considering ways to improve IT infrastructure, any "assembly required" can be costly.